From 02/01/2009 to 03/02/2009

03/02/2009

06:20 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Battery voltage looks good with this collection interval, and I haven't noticed any data gaps. Derik Barseghian

02/27/2009

12:26 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Have started a new collection schedule this morning (every 10m, with 3 retries 2m apart, no secondary retries) that b... Derik Barseghian
09:42 AM Bug #3562: calculate global means and variances for each run
The analyze workflow now generates a table displaying global statistics,
and a scatter plot of average vs standard de...
Daniel Crawl

02/25/2009

04:50 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Eric would like to see webplots of the new data. I've renamed the reap01
(Baskett) datasource (which was still named ...
Derik Barseghian
04:49 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Paul was kind enough to put up our station fence today, and try to better align
the yagi. He said it only seemed slig...
Derik Barseghian
04:40 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Correction to last comment: the soil reflectometer that's not inserted, the one to be put into plot 28, is giving a l... Derik Barseghian
11:37 AM Bug #3839 (New): improve aphidPanTrapVsGDD_BYDVstudy workflow
Elizabeth would like this workflow to plot *cumulative* degree days, and also plot weather data from the other sites ... Derik Barseghian

02/24/2009

01:20 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
It should be noted that plot 28, a fenced plot, has not been instrumented. As both light bars were munched on, we wer... Derik Barseghian
01:08 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Station has been deployed to McLaughlin.
There are many loose ends and improvements I would like (not listed in this...
Derik Barseghian

02/12/2009

06:07 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Flying to PDX morn of Feb 15. Rented a 10' Budget truck to drive south, a bit obnoxious, but the cheapest soln for a ... Derik Barseghian

02/02/2009

04:27 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- buy fish tape
- determine pvc lengths and layout
map of site:
http://www.google.com/maps/ms?ie=UTF8&t=h&msa=0&msid...
Derik Barseghian
12:16 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Apogee order arrived some time ago.
Feb 16 is a holiday, Baskett office is closed. I can still disassemble the stati...
Derik Barseghian
 