From 03/03/2009 to 04/01/2009

03/26/2009

11:35 AM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Eric is ok with instrumenting plot 28 in mid-April.
Apogee recalibration fee is $50 a unit (plus cable lengths I imag...
Derik Barseghian

03/12/2009

12:21 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Yesterday I finished catching up the data-gap from before the new schedule was implemented. I also found a large numb... Derik Barseghian

03/10/2009

01:47 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
In doing some of the tests today, I've introduced at lease two duplicate records in the data-file. I plan to leave th... Derik Barseghian
01:42 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
Shawn Gerrity is at the site today for fertilization. We've reoriented the yagi vertically, but so far the radio link... Derik Barseghian

03/06/2009

10:54 AM Bug #3563: calculate differences between global means
The analyze workflow now generates a matrix displaying global mean differences.
It currently shows a full matrix; th...
Daniel Crawl

03/03/2009

12:39 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- emailed Apogee to see about recabling fee for light bars. We need a bar so we can instrument plot 28.
- Shawn Gerr...
Derik Barseghian
 