Merged in the D1_0_6_2_BRANCH changes that include the transition from ObjectFormat calls to ObjectFormatCache calls.
Fix errors in workflow scheduler unit test
Add ability to schedule daily, weekly and monthly jobs.
move dbconnection object out of base class and create it for each db access so it can be released
Add session validation to metacat tpc and workflow scheduler. Fix sanparks skin session management so it always uses the logged in session id.
change name of workflowjobid parameter to be workflowjobname which is more accurate
Add unshedulejob to base class
Change location of PropertyService to properties directory
Change MetaCatVersion to MetacatVersion
Fix references to db classes that were moved and refactoring missed.
Create database and shared directories for database management code and shared code respectively.
Add the ability to delete a scheduled workflow (move status to deleted in database)
Added end time to workflow scheduler.
Input date formatting changes
Fix issue where every scheduled job gets the same parameters.
Implement stop method in services. Stop all services when shutting down metacat. This primarily keeps scheduler from hanging with open threads.
remove this file. This is now handled in db update scripts.
Beef up comments
Workflow scheduler and archiving fixes for TPC workflow engine
Added generic scheduler and workflow scheduling functionality.
Add scheduler and workflow schedule functionality