Activity
From 01/29/2009 to 02/27/2009
02/27/2009
- 12:26 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Have started a new collection schedule this morning (every 10m, with 3 retries 2m apart, no secondary retries) that b...
- 09:42 AM Bug #3562: calculate global means and variances for each run
- The analyze workflow now generates a table displaying global statistics,
and a scatter plot of average vs standard de...
02/25/2009
- 04:50 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Eric would like to see webplots of the new data. I've renamed the reap01
(Baskett) datasource (which was still named ... - 04:49 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Paul was kind enough to put up our station fence today, and try to better align
the yagi. He said it only seemed slig... - 04:40 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Correction to last comment: the soil reflectometer that's not inserted, the one to be put into plot 28, is giving a l...
- 11:37 AM Bug #3839 (New): improve aphidPanTrapVsGDD_BYDVstudy workflow
- Elizabeth would like this workflow to plot *cumulative* degree days, and also plot weather data from the other sites ...
02/24/2009
- 01:20 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- It should be noted that plot 28, a fenced plot, has not been instrumented. As both light bars were munched on, we wer...
- 01:08 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Station has been deployed to McLaughlin.
There are many loose ends and improvements I would like (not listed in this...
02/12/2009
- 06:07 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Flying to PDX morn of Feb 15. Rented a 10' Budget truck to drive south, a bit obnoxious, but the cheapest soln for a ...
02/02/2009
- 04:27 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- - buy fish tape
- determine pvc lengths and layout
map of site:
http://www.google.com/maps/ms?ie=UTF8&t=h&msa=0&msid... - 12:16 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Apogee order arrived some time ago.
Feb 16 is a holiday, Baskett office is closed. I can still disassemble the stati...
Also available in: Atom