Activity
From 02/28/2009 to 03/29/2009
03/26/2009
- 11:35 AM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Eric is ok with instrumenting plot 28 in mid-April.
Apogee recalibration fee is $50 a unit (plus cable lengths I imag...
03/12/2009
- 12:21 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Yesterday I finished catching up the data-gap from before the new schedule was implemented. I also found a large numb...
03/10/2009
- 01:47 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- In doing some of the tests today, I've introduced at lease two duplicate records in the data-file. I plan to leave th...
- 01:42 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Shawn Gerrity is at the site today for fertilization. We've reoriented the yagi vertically, but so far the radio link...
03/06/2009
- 10:54 AM Bug #3563: calculate differences between global means
- The analyze workflow now generates a matrix displaying global mean differences.
It currently shows a full matrix; th...
03/03/2009
- 12:39 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- - emailed Apogee to see about recabling fee for light bars. We need a bar so we can instrument plot 28.
- Shawn Gerr...
03/02/2009
- 06:20 PM Bug #3650: move MET station to McLaughlin and begin work on Engineering view
- Battery voltage looks good with this collection interval, and I haven't noticed any data gaps.
Also available in: Atom