Project

General

Profile

Actions

Bug #3650

open

move MET station to McLaughlin and begin work on Engineering view

Added by Derik Barseghian about 16 years ago. Updated about 15 years ago.

Status:
New
Priority:
Normal
Category:
terrestrial
Target version:
Start date:
11/12/2008
Due date:
% Done:

0%

Estimated time:
Bugzilla-Id:
3650

Description

Very soon:

- Order "office test gear": low power pc, datalogger, radios, antennas, and some sensors.
I'll use this for testing and to work on engineering view needs.
- Order additional gear for McLaughlin, if needed.
- Depending on Eric's plot layout - multiplexor, additional light bars, soil probes.
- If we determine we need to go through their repeater station: radio and antenna.

Sometime during Dec 4 - 17 (when Cathy and Paul are at McL)

- Fly to Portland, drive to Baskett.
If Eric hasn't already done so:
- Determine problem with light measurements.
- Obtain any desired metadata about the station (e.g. GPS position)
- Break down station
- Deploy at McLaughlin.
- Eric might not be able to come to McL, I may need someone to help (Eric student, McL or Davis person or...Jing?)

Later:

- Once low power pc stack is working in office, return to and augment McL station.
- We'll be in the 12-24 month period when we should service some sensors. Swapping in office sensors may be easier.
- Possibly deploy another station at McL, Hopland (1.5hrs west of McL) or Sierra Foothill (2.5 hours east of McL) on same trip.
Actions

Also available in: Atom PDF