Feature #5982
open
- Assignee set to Chris Jones
Moving this to 1.1.0 since we don't have the plans plan worked out.
- Parent task deleted (
#5952)
- Tracker changed from Task to Feature
- Assignee changed from Chris Jones to Matt Jones
- Target version deleted (
1.0.0)
Moving back to backlog as we're not sure on the timing of the plans feature rollout.
Can someone (Matt, Chris?) give more information on what this "Plans page" is? Otherwise I am going to assume this idea was nixed and I'll close the ticket.
Also available in: Atom
PDF